
Stars Over the River Drin
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Drama
Rating
0.0/10
Release Date
1978-04-25
Runtime
69 minutes
Status
Released

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
0.0/10
1978-04-25
69 minutes
Released